C Squared Project Solutions

Planning & Scheduling

A schedule built on optimism misleads everyone who relies on it. A realistic, well-structured one is the single source of truth that keeps a project honest – showing what it will genuinely take, and giving early warning when things slip. Getting the plan right is what makes everything downstream controllable.

How we do it

We build detailed, realistic schedules resourced to the right level of detail, then maintain and control them across the project. Contractor and supplier programmes are reviewed for contractual compliance and integrated into one coordinated master schedule – using critical path analysis, schedule risk analysis and rolling-wave planning to keep the timeline achievable and transparent.

What we offer

  • Baseline schedule development and critical path analysis
  • Master programme integration and control
  • Resource and cost loading
  • Progress monitoring, reporting and dashboards
  • Schedule risk analysis
  • Rolling-wave (look-ahead) scheduling
  • Schedule impact of changes and variations

Is Your Project Schedule Built for Accuracy?

Request a Review

Testimonials

Built on Delivery. Backed by Trust.

Scroll to Top